COMMERCIAL / RETAIL
Lowe's Home Improvement Center, Chester, New York
Project Manager/Team Leader for fast-track permitting of a 159K sq. ft. Lowe's Home Improvement Center The on-site wetland corridor and utility easements through the site required out of the box thinking in order to meet project objectives and permitting requirements.
Lowe's Home Improvement Center, Derby, Connecticut
Project Manager/Team Leader for fast-track permitting of a 159K sq. ft. Lowe's Home Improvement Center, with additional retail and restaurant pad site development. Challenges included extensive rock cuts (50’+) in close proximity to existing residences.
Shopping Center at the Former Milford Jai Alai site, Milford, Connecticut
Project Manager/Team Leader for the design and permitting of a new shopping center with over 285K sq. ft. of retail, restaurant, and hotel space. Challenges included extensive traffic improvements and off-site right-of-way acquisitions.
Former Wal-Mart Plaza, Wallingford, Connecticut
Project Manager/Team Leader for the design and permitting of the redevelopment of the former Wal-Mart Plaza in Wallingford Connecticut with a 175K sq. ft. Lowe's Home Improvement Store. The proposed stormwater system design included innovative techniques which allowed extensive re-use of the existing stormwater management system on the site.
Cross Road Centre, Waterford, Connecticut
Project Manager/Team Leader for the design, permitting, and construction administration for the redevelopment of an existing retail center with a 175k sq. ft. Lowe's Home Improvement Center. Challenges included extensive utility and driveway reconstruction while maintaining the operation of the operating stores within the center.
Lowe's Home Improvement Center, Cromwell, Connecticut
Project Manager/Team Leader for the design, permitting, and construction administration for the development of a new 159K sq. ft. Lowe’s Home Improvement Center. Challenges included extensive work in the floodplain, extensive wetlands on the site, and off-site roadway improvements. Regulatory challenges included a necessary zone change and relief from standard parking requirements.